usdt交易平台app下载

Solutions

We focus more on you, the doctor taking care of your patients, and help you spend less time focusing on your equipment. Through a series of Operating Room innovations from Chong Wai, we help you provide world-class medical quality.
Based on more than 60+ years of experience in operating room construction, Chong Wai has a deep understanding of the feelings of doctors on the operating table, and then provides you with solutions that make the operating room easier to use and more comfortable, as well as complete after-sales services.

Mile stone of Operation Room

  • Current traditional
  • FLEXDOCK
  • SpaceSpace
    Internal OR Space is fixed.
    1. New customized stainless steel instrument cabinet equipment, which can convert traditional operating room instruments into unused space structure inside the equipment cabinet is extended to increase the interior of the operating room available space.
    2. Unlike traditional operating rooms, as long as the structural space is determined, the configuration of internal equipment and cabinets can be considered later.
  • FunctionFunction
    Fixed after construction. If the needs change in the future, the existing sterile board wall must be removed. If the original pipeline is in a hidden place, the equipment must be further dismantled before construction.
    1. The anti-earthquake modular wall frame and new joint wall design can be adapted to future other department update needs or operating room flow adjustments. The equipment location can be changed or even moved in a very short time without dismantling the wall and causing environmental pollution in the operating room. Remove unnecessary equipment cabinets/ medicine cabinets/ hygiene cabinets … etc. and convert them into storage space.
    2. The space inside the operating room is flexible, and the specially designed surrounding maintenance cover set can expand or change the electrical/ network/ gas outlet/ monitor locations as needed without removing the wall panels.
  • TimeTime
    • Each new OR : 80 contraction days
    • The partial renovation of a single operating room: about 30 days, and the indoor cleanliness needs to be re-tested.
    • Each new OR has 80 contraction days.
    • The partial renovation of a single operating room: 1 to7 days, and re-tested indoor cleanliness has no longer required.
關閉

建議您使用以下瀏覽器觀看本網站,
以獲得最佳瀏覽效果。

要下載瀏覽器,請直接點擊以下: